News
Stay informed about our news and projects
20 January 2026
ADIF awards ENA Tecnología the upgrade of protection systems at 10 level crossings on the Torralba-Soria line
ENA Tecnología will execute the works to upgrade protection systems at level crossings on line 202 Torralba-Soria.
Read more ->
15 December 2025
RAILWATCH 5020 Installations in 2025
Throughout 2025, several RAILWATCH 5020 systems were installed, reinforcing safety at level crossings.
Read more ->
15 April 2024
RAILWATCH 5020 Obstacle Detector: Validated by ADIF
We are pleased to announce that our RAILWATCH 5020 system has been officially validated by ADIF as an obstacle detection system.
Read more ->